Skip to content
⚡ Financing & Payment Plans Available - Contact Us Today! ⚡
Completed Chicago kitchen remodel Completed Chicago bathroom remodel

Two Essential Rooms · One Experienced Team

Kitchen & Bathroom Remodeling in Chicago

Plan both renovations as one coordinated project with clearer scheduling, consistent design, and one dedicated point of contact.

Request a Combined-Project Estimate

Why Combine the Work?

A unified plan from design through completion

Bundling the kitchen and bathroom does not mean rushing both rooms at once. It means making the design, budget, procurement, and construction sequence work together.

One Coordinated Plan

Align design decisions, permits, material orders, trades, inspections, and finish work across both rooms.

Efficient Trade Scheduling

Coordinate plumbing, electrical, tile, cabinetry, painting, and flooring without rebuilding the schedule twice.

Consistent Design

Carry complementary cabinetry, hardware, surfaces, lighting, and finishes through the home.

Clearer Budget Control

Review allowances, shared costs, priorities, and optional upgrades within one complete project scope.

Complete Kitchen Remodeling

Complete Kitchen Remodeling

Layouts, wall changes, cabinetry, countertops, backsplashes, lighting, flooring, plumbing, ventilation, and appliance coordination.

Complete Bathroom Remodeling

Complete Bathroom Remodeling

Showers, tubs, waterproofing, tile, vanities, fixtures, ventilation, lighting, plumbing, flooring, and accessibility improvements.

Whole-Home Coordination

Whole-Home Coordination

Protection, permits, inspections, material logistics, adjacent-room repairs, finish transitions, cleanup, and final walkthroughs.

Start Your Project

Tell us about both spaces

Share your goals, preferred timing, and the rooms you want to transform. We’ll help define a coordinated scope and practical next step.

Prefer to talk? Call 773-283-9200

Common Questions

Kitchen and bathroom project FAQs

Is it better to remodel the kitchen and bathroom together?

It can be when the homeowner is prepared for the combined scope. Shared planning, trade coordination, protection, and finish decisions may be more efficient, but the right sequence depends on budget, occupancy, and material lead times.

Do both rooms have to be under construction at the same time?

No. One contract and project plan can still phase the rooms so essential facilities remain usable when practical.

Can you coordinate plumbing and electrical work for both spaces?

Yes. We coordinate the applicable licensed trades, rough work, inspections, fixtures, and finish installation as part of the overall remodeling scope.

How do we receive an accurate estimate?

We begin with the rooms, existing conditions, layout goals, selections, permit needs, and preferred phasing. A detailed scope is more useful than multiplying square footage by a generic rate.

What our clients say about us